Boiler Plant Upgrade - Industrial Facility
- New 100,000 PPH Steam Plant
- Convert #6 Fuel Oil to Natural Gas
- Re-pipe Condensate System
- Replace 450 Steam Traps
- Provide Web Based Controls to Eliminate Boiler Operator
- Backup Generator
- Reduced Operating Costs over $2,000,000 per year
- Less Than 2 Year Payback